Latest CSP News
ICF Builder Awards 1st Place for Parklands Manor
1st place awarded at the prestigious ICF Builder Awards and also 1st place in the People’s Choice category voted by the ICF industry for Parklands Manor which CSP Engineered. see here https://www.icfmag.com/2021/01/parklands-manor/
Continue Reading ICF Builder Awards 1st Place for Parklands Manor
HE&D Electrical Contractors Working On the CSP New Office Wiring
Since April 2020, HE&D Commercial and Industrial Electrical Contractors have been working together with CSP under the ‘IBG Group’ umbrella! This month they have rewired our offices inline with the new layout necessary to comply with the Corina virus distancing laws. “Social distancing is a key part of our business’s risk assessment and is one of the steps needed to make our workplace COVID-secure. The new…
Continue Reading HE&D Electrical Contractors Working On the CSP New Office Wiring
Abseiling/Rope Access on Factory Chimney Stack
A world renowned factory sitting on the side of the Thames near the QE2 Bridge, most all of the UK’s washing and household products are made there. Shutting down the plant for even minutes costs the company hundreds of thousands of pounds in lost revenue therefore we were called in to survey and report the internal degradation on the huge Chimney stack as fast…
Continue Reading Abseiling/Rope Access on Factory Chimney Stack
Signature – Hendon Hall Site – Video
Watch The Video: https://vimeo.com/432482860/76d3794b26 CSP are the Structural Engineers responsible for the design and detailing of the new concrete framed building including the piled foundations and basement structures. CSP are also the Structural Engineers for the assessment, renovation, repair and upgrading of the existing Listed Hendon Hall building on the same site. CSP are also the drainage design engineers for the development.
CSP APPOINTED BY NUDURA
CSP have been appointed by NUDURA to update their technical literature to include the use of mass concreteWalls for residential use.The design is being led by Professor Narayanan.This follows CSP previously completing design tables for the use of the product.For more details refer tohttps://nudura.com/
APRIL 2020 GAVINS PASSES HIS CHARTERSHIP EXAM
Congratulations to Gavin McIntosh who has just been informed thathe has passed the Institute of Structural Engineers Chartership exam that he took in January 2020. Clearly the drinks are on Gavin when we come out of lockdown
Continue Reading APRIL 2020 GAVINS PASSES HIS CHARTERSHIP EXAM
SIGNATURE WANDSWORTH OPENING
The new Signature Wandsworth Care home officially opened on 30th MARCH 2020 CSP are to delighted to have been part of the design team that deliveredthe care home in a busy urban location.The care home was constructed directly over a major Thames Water relief sewer, which required detailed liaison with Thames Water Engineers to obtain approval for the design.This one of numerous projects that…
ROYAL STAR & GARTER HOME HIGH WYCOMBE OPENS
On 20th February 2020 the Royal Star and Garter home in High Wycombe was opened officially by HRH Princess Alexandra. Alan Pipe was there to represent CSP and was one of the fortunate people selected to meet Her Royal Highness.This is the second home that CSP have had the honour to be Engineers for the charity and it was brilliant to see the home…
Continue Reading ROYAL STAR & GARTER HOME HIGH WYCOMBE OPENS