Phase 1 of 3 Pelican Way

PROJECT ; Phase 1 of 3 Pelican Way Rochester for TBH Holdings Industrial and Retail Park CIVILS

PROJECT NUMBER: HAD01 CIVILS

Client: TBH HOLDINGS

Extensive cut and fill operation to prepare site for Phases 1,2 and 3 for mixed Industrial Retail Park use on site extending to 1.5 Ha’s. Linear site is situated on top of steep embankment situated between Rochester Way and M2 Motorway at lower level requiring RC retaining walls on lower side and variable Gabion retaining walls on the high side. Phase 3 is currently considering reinforced earth retaining structures.