cspadmin

Port of Tilburys Grain Terminal Silo rebuild gets underway

Major building work is underway at the UK’s largest grain terminal at the Port of Tilbury following a fire in 2020 which damaged its grain silos. CSP became involved from the Silo explosion 3rd July 2020 being Appointed Civil and Structural Engineering’s Consultants undertaking structural damage and potential repair evaluation, continuing to full design of …

Port of Tilburys Grain Terminal Silo rebuild gets underway Read More »

CSP APPOINTED BY NUDURA

CSP have been appointed by NUDURA to update their technical literature to include the use of mass concreteWalls for residential use.The design is being led by Professor Narayanan.This follows CSP previously completing design tables for the use of the product. For more details refer tohttps://nudura.com/

SIGNATURE WANDSWORTH OPENING

The new Signature Wandsworth Care home officially opened on 30th MARCH 2020 CSP are to delighted to have been part of the design team that deliveredthe care home in a busy urban location.The care home was constructed directly over a major Thames Water relief sewer, which required detailed liaison with Thames Water Engineers to obtain …

SIGNATURE WANDSWORTH OPENING Read More »