The Practice has a strong Civils section and invariably many commissions include infrastructure design for roads, drainage and flood defence schemes. The need to incorporate sustainable urban drainage systems to all new development and re-development sites has led to an increased workload in this area over recent years. As such we have undertaken a number of projects solely based upon drainage issues as well as dealing with projects which include drainage as part of the design package. During the course of such projects we have dealt with the Environment Agency, the Forestry Commission and various County Councils with regard to drainage and safe disposal of both foul and surface water drainage in a variety of situations. Many of these projects have been incorporated into a variety of road building and repair projects. Currently we have been tasked with constructing a new section of road and tunnel repair along with a new rockfall canopy on Sir Herbert Miles Road in Gibraltar.
|
|
   |