A substantial dry storage facility measuring 225m by 63m on plan and rising nearly 26m to ridge. Utilising heavy grab loading and unloading for fast distribution. The project was procured on a design and build basis, and CSP were commissioned by Costains for the complete design of the facility.
The photographs shows the facility under construction, to emphasise the structural steelwork, and the finished building.
CLIENT: PORT OF LONDON TILBURY LIMITED
D & B CONTRACTOR: COSTAINS
